Soil nailing is a widely used reinforcement technique in excavation projects. It involves stabilizing slopes by installing steel-reinforced soil nails, followed by the application of a wire mesh and sprayed concrete layer to form a composite retaining structure.

Construction Process of Soil Nailing Wall

1. Slope Surface Preparation

  • Excavate soil in layers, with each layer depth matching the vertical spacing of soil nails.
  • The excavation level should be 200mm below the nail position.
  • Trim the slope surface, removing protruding soil and compacting loose areas to ensure a smooth shotcrete application.

2. Initial Shotcrete Layer

  • Apply concrete top-down, keeping the nozzle 0.8–1.5m from the surface.
  • Maintain a perpendicular spray angle with a minimum thickness of 40mm.
  • Use accelerators to enhance setting time and prevent slump.

3. Drilling & Cleaning for Soil Nails

  • Mark drill points according to design specifications.
  • Begin drilling slowly, increasing speed once a stable depth is reached.
  • Clean holes using high-pressure air or water to remove debris.

4. Soil Nail Installation

  • Cut reinforcement bars (+20cm longer than design length) with a 90° bend (20cm) at the outer end.
  • Install centralizers every 1–2m to ensure proper alignment.
  • Attach grout pipes (extending 0.5m from the hole bottom) and secure nails to the reinforcement mesh.

5. Grouting Process

  • Use pressure grouting, inserting the pipe 250–500mm from the hole base.
  • Seal the hole with a grout stopper and maintain pressure for 1–2 minutes after filling.
  • Slowly withdraw the pipe while ensuring the outlet remains submerged for complete air expulsion.

6. Reinforcing Mesh Installation

  • Install wire mesh layer by layer with:
    • ≥20mm cover thickness
    • ≥30d lap length (10d for single-side welding)
    • 0.5m extension beyond slope edges

7. Weep Hole Installation

  • Insert 400–600mm long, ≥40mm diameter weep holes (slightly downward) at 1.5–2m spacing.
  • Ensure pipes protrude from the shotcrete layer to drain accumulated water.

8. Final Shotcrete Application

  • Begin after mesh and nail inspections.
  • Spray perpendicularly in layers (first layer ≥40mm).
  • Allow each layer to set before applying the next.
  • Maintain 2h water curing post-setting to prevent cracking.

Key Technical Specifications

Types of Soil Nailing Walls

  1. Standard Soil Nailing Wall
  2. Prestressed Anchor Composite Wall
  3. Cement-Soil Pile Composite Wall
  4. Micro-Pile Composite Wall

Applicability & Requirements

  • Safety Levels: Suitable for Grade II & III excavation supports.
    • Standard walls: ≤12m depth (non-soft soil, above water table).
    • Prestressed anchor walls: ≤15m depth.
    • Cement-soil pile walls: ≤6m in soft clay.

Design & Construction Standards

Parameter Requirement
Slope Ratio ≤1:0.2
Nail Spacing 1–2m (H & V)
Drill Angle 5–20°
Hole Diameter 70–120mm
Reinforcement HRB400/500, Ø16–32mm
Grout Strength ≥20MPa
Shotcrete Thickness 80–100mm (≥C20)
Wire Mesh Ø6–10mm @150–250mm

Critical Construction Practices

✔ Follow “step-by-step excavation, immediate support” principles.
✔ Test nail pull-out resistance per layer.
✔ Complete nail & shotcrete within 24h (12h for soft clay).
✔ Allow 48h for grout setting before next excavation.
✔ Use 2-stage grouting:

  • 1st: Cement mortar (≥1.2x hole volume).
  • 2nd: Pure cement slurry (30–40% of 1st stage) @ 0.4–0.6MPa.
    Max aggregate size: 15mm.
    Minimum rebar cover: 25mm.
wedadmin

Recent Posts

10 Major Reasons and 9 Major Control Measures Affecting the Quality of Bored Piles

Bored cast-in-place piles have the advantages of low construction noise, and low vibration, pile length…

1 year ago

Common Quality Problems and Prevention Measures for Bored Pile Construction!

    Bored cast-in-place piles have the advantages of low construction noise, and low vibration,…

1 year ago

The Four Major Construction Techniques of Rotary Drilling Rigs Have Been Summarized for You!

The four major construction technologies are dry hole forming technology, slurry static pressure technology, casing…

1 year ago

Read the Soil Nail Wall Construction Technology in One Article!

Soil nail support is a new type of retaining structure developed in recent years for…

1 year ago

Summary of the Key Points of the Entire Construction Process of Bored Piles!

Pile Foundation Classification and Construction Principles 1. Classification According to Load-Bearing Piles ① Friction type…

1 year ago

Steel Sheet Pile Cofferdam Construction Method

Steel sheet pile cofferdams are suitable for basic projects such as sandy soil, gravel soil,…

1 year ago