(I) Preparation work 1. Before construction, the engineering geological data and hydrogeological data should be mastered, and the quality inspection…
SMW is the abbreviation of Soil Mixing Wall. This construction method was introduced in Japan in 1976. It is a…
Introduction to Slurry Wall Bored Piles Slurry wall bored piles utilize drilling mud to stabilize borehole walls during mechanical drilling.…
Why Is Cleaning Bored Piles Necessary? Cleaning bored piles (also known as cleaning the borehole) is a crucial step in…