#foundation drill

A Comprehensive Inventory of Safety Points for Various Types of Pile Foundation Construction

Nowadays, the construction of large buildings is becoming more and more common. The increase in the scale of buildings has…

1 year ago

Construction Technology and Safety of Pile Driving on Water

1. Acceptance of finished piles After the PHC piles are transported to the site, the relevant quality assurance information of…

1 year ago

Which Rotary Drilling Rig Bits Should Be Used in Different Strata?

Rotary drilling rigs are the most common equipment in current pile construction. Since the geology of each place is different,…

1 year ago

Six Commonly Used Detection Methods for Pile Foundations and Applicable Pile Foundation Types

The pile foundation is the main load-bearing part of the structure, and its quality is directly related to the safety…

11 months ago

Prestressed Pipe Pile Foundation Construction Procedures and Quality Control Points

Prestressed pipe pile construction process The construction process of prestressed pipe piles is: measuring and setting out positioning → pile…

11 months ago

Construction Process and Quality Control Points of Prestressed Pipe Pile Foundation

Prestressed Pipe Pile Construction Process The construction process of prestressed pipe piles is as follows: measurement and positioning → positioning…

8 months ago

Technical Problems and Solutions Commonly Encountered by Rotary Drilling Rigs in Drilling Construction in Special Strata!

At present, rotary drilling rigs have become one of the mainstream construction machinery for bored piles due to their advanced…

8 months ago

Steel Sheet Pile Construction Is Not as Simple as You Think!

1, General requirements 1. The location of the steel sheet piles should meet the design requirements and facilitate the construction…

8 months ago

How to Deal with Collapsed Holes, Blocked Conduit Pipes, And Floating Steel Cages When Piling?

1.1 Construction Layout Before the construction layout, the measurement points provided by the design shall be reviewed, the plane control…

8 months ago

Solve Common Quality Problems of Long Spiral Bored Cast-in-Place Piles at One Time, Take a Look!

1. Common quality problems during construction (1) Pipe blockage: This manifests as concrete blocking the pumping pipeline or drill pipe…

7 months ago

The Key Technical Points and Precautions for Bored Cast-in-Place Pile Foundation Construction Are Sorted out Here!

1. The Drilling Methods and Principles Can Be Divided into the Following Categories: Spiral drilling, positive circulation rotary drilling, reverse…

7 months ago

Cause Analysis and Preventive Measures of Common Quality Problems of Bored Cast-in-Place Piles (Punched Cast-in-Place Piles)

1. Common problems During the construction process, bored piles are subject to natural conditions such as technology and strata, as…

7 months ago