(I) Preparation work 1. Before construction, the engineering geological data and hydrogeological data should be mastered, and the quality inspection…
SMW is the abbreviation of Soil Mixing Wall. This construction method was introduced in Japan in 1976. It is a…
Construction process Construction preparation → Three connections and one leveling on site → Preparation of equipment, tools, and materials (pre-purchase…
Why Is Cleaning Bored Piles Necessary? Cleaning bored piles (also known as cleaning the borehole) is a crucial step in…
During the construction of bored piles, the uplift of rebar cages frequently occurs, ranging from minor displacements of a few…
What Are CFG Piles? CFG (Cement Fly-ash Gravel) piles are a type of composite foundation pile with a strength grade…