How to Deal with Collapsed Holes, Blocked Conduit Pipes, And Floating Steel Cages When Piling?
1.1 Construction Layout Before the construction layout, the measurement points provided by the design shall be reviewed, the plane control network and the elevation control network shall be re-measured, and…