Construction Technology and Key Points of Bored Cast-in-Place Pile Positive and Reverse Circulation Foundation!
(I) Preparation work 1. Before construction, the engineering geological data and hydrogeological data should be mastered, and the quality inspection reports of various raw materials and products used should be…