Bored Pile Construction: Comprehensive Guide to Quality Control and Post-Grouting Techniques
Project Overview of Bored Piles This project features a ±0.000 absolute elevation of 5.050, with natural ground elevation at -0.550. The excavation depth reaches 15.2 meters, extending to 17.05 meters…