Long Spiral Drilling Pumping Super-Fluid Concrete with Post-Placement Reinforcement Cage Technology

  • Post author:
  • Post category:Blog

1. Introduction The long spiral drilling pumping super-fluid concrete with post-placement reinforcement cage technology evolved from Japan's CIP (Cast-In-Place) method. Unlike conventional bored piles, this technique involves drilling to the…

Continue ReadingLong Spiral Drilling Pumping Super-Fluid Concrete with Post-Placement Reinforcement Cage Technology

Application and Analysis of PC Method Combined Steel Pipe Piles in Foundation Pit Engineering

  • Post author:
  • Post category:Blog

Abstract For a long time, deep foundation pit support engineering has primarily utilized reinforced concrete and steel structure supports, with reinforced concrete being particularly widespread. However, with advancements in engineering…

Continue ReadingApplication and Analysis of PC Method Combined Steel Pipe Piles in Foundation Pit Engineering