Main Trenching Methods
The trenching process is the most important in the construction of underground continuous walls, which often accounts for more than half of the trench construction period. Therefore, doing a good…
The trenching process is the most important in the construction of underground continuous walls, which often accounts for more than half of the trench construction period. Therefore, doing a good…
0 Gravel pile is a kind of loose pile. It is made of gravel (pebbles) without bonding strength as the main material. After drilling holes in the soft foundation by…
In the process of long spiral bored concrete pile construction, to reduce the vibration of surrounding buildings, long spiral drilling rigs are used for drilling holes. This type of hole…
1. General requirements 1. The location of the steel sheet piles should meet the design requirements and facilitate the trench foundation earthwork construction, that is, leave room for formwork and…
The whole process of refined construction of prestressed bridges mainly includes seven aspects: pile foundation, pedestal, column, cap beam, precast slab, beam-slab, and bridge deck. 1. Fine construction of bored…
During the pouring process of bored cast-in-place piles, the steel cage often floats up. In mild cases, the steel cage may float up by a few centimeters to tens of…
Pile foundations are widely used due to their high bearing capacity, good stability, small settlement and differential deformation, fast and stable settlement, strong seismic performance, and adaptability to various complex…
The rotary full casing construction method is also known as the "BUROTO" method. The steel casing is used to protect the wall during the hole-forming process. It has the characteristics…
According to the characteristics of the pile and the vertical force, the pile foundation can be divided into two categories: friction pile and end-bearing pile. In construction, only by fully…
1. Common problems During the construction process, bored piles are subject to natural conditions such as technology and strata, as well as management conditions such as process arrangement and management…
1. Common quality problems during construction (1) Pipe blockage: This manifests as concrete blocking the pumping pipeline or drill pipe during the concrete pouring process. There are many reasons for…
1. The Drilling Methods and Principles Can Be Divided into the Following Categories: Spiral drilling, positive circulation rotary drilling, reverse circulation rotary drilling, submersible drilling, punching drilling, impact drilling, and…